Mr Charger | Terms & Conditions

Vehicle Maintenance

Full terms and conditions apply when a Mr Charger is involved in your order, please see below. The image is not based off of Mr Charger.

Posted on 16 Oct 2025 Posted by Jess Stanbrook

 

 

Standard Installation Includes:

 

Up to 10 metres of cabling from the charge point to the consumer unit

Installation of a Surge Protection Device (SPD)

All cables clipped directly to the surface (no containment)

No groundwork (e.g., trenching or civil works)

Compliance with current property earthing regulations

Charger must be installed on the property using the existing earthing setup

Non-standard installs available by quote (case-by-case basis)

Stay connected with Rivervale

Rivervale Logo